Our Process

Eight Stages, and You Know
Where You Are in Them

Most complaints about roofing contractors are not about the roof. They are about not knowing what is happening. This is the sequence every project follows, and what you should expect at each point.

Roofing crew installing architectural shingles over underlayment
Stage by Stage

What happens, in order

Stages one to three apply to every enquiry, including the ones that end with us telling you the roof is fine. Four onward apply once there is work to do.

01
You · a few minutes

Initial request

You tell us what you are seeing and where the property is. The request form asks about the roofing system, what the roof needs and how urgent it is, because a leak into a bedroom and a roof you are planning to replace next year get handled differently.

Most useful to include

  • What you have noticed, in your own words
  • When it started, and whether it is getting worse
  • Whether water is coming in now
  • Photographs if you have them

What happens next

  • We confirm we have the request
  • We arrange a time to come and look
  • Urgent situations are prioritised over planning enquiries
02
Us at the property · one to two hours

Roof inspection

The full roof, not only the area you are worried about. The covering across every plane, then every place the roof is interrupted — flashings, valleys, ridges, penetrations, terminations — and the drainage that serves it. Inside and in the attic where access allows.

Covered every time

  • Condition of the covering across all planes
  • Wall, chimney and skylight flashings
  • Valleys, ridges, hips and terminations
  • Penetrations and anything mounted after the roof
  • Gutters, outlets and downspouts
  • Attic and deck underside where reachable

You do not need to

  • Go on the roof, at any point
  • Know roofing terminology
  • Have decided anything in advance
03
Us to you · same visit or shortly after

Findings and recommendations

Photographs of everything we recommend acting on, and a written summary in plain language: what we found, what is causing it, what is urgent and what can wait. If a repair will not solve the problem, that is stated. If the roof is fine, that is stated too.

Written so you can

  • See the evidence rather than take our word for it
  • Get a second opinion on the same information
  • Decide on your own timescale

Some enquiries stop here

  • Roofs with years of life left
  • Problems that are not roofing problems
  • Second opinions on somebody else's quote
04
Us to you · once you want a number

Scope and estimate

An itemised scope: what will be done, in what order, with which materials, and what it costs. Itemised so you can see what each part is for and question any of it — including the parts you would rather not pay for.

The scope states

  • Exactly what work is included
  • The specific products being used
  • How deck repair is handled if it is needed
  • A projected schedule
  • Anything explicitly excluded

Worth asking about

  • Which items you could defer
  • What changes if we find damaged decking
  • What is not included and why
05
Together · before anything is ordered

Materials and scheduling

Profile, colour and finish get decided, along with the practical arrangements: start date, access, where material and debris will sit, and where your vehicles need to be. Permitting for the address is dealt with at this stage.

Decisions here

  • Product, profile and colour
  • Gutter colour where it is part of the job
  • Start date and expected duration
  • Access, staging and parking

Honest about timing

  • Material availability can move dates
  • Permitting timelines vary by municipality
  • Weather moves roofing schedules, always
06
Us at the property · the main event

Installation or repair

Protection goes down before anything comes off. Then tear-off, deck inspection, underlayment and flashings, and the covering. On a replacement, the deck inspection is the point where a scope can genuinely change — and if it does, you hear about it that day with a photograph.

Protected before work starts

  • Landscaping and planting beds
  • Pool cages, screens and lanais
  • Air conditioning units
  • Driveways, walkways and walls below

You will hear from us if

  • Decking needs replacing
  • Something is found that changes the scope
  • Weather moves the schedule
07
Us · before we leave for the last time

Cleanup and review

Debris hauled away, gutters cleared of the waste that installation generates, and a magnetic nail sweep across driveways, paths, lawn and beds. Then a walk of the property with you — outside and in — while the crew is still there rather than after they have gone.

Cleanup covers

  • All roofing debris removed from site
  • Gutters and downspouts cleared of waste
  • Magnetic nail sweep across hard surfaces and lawn
  • Protection removed and landscaping checked

The walkthrough is when to

  • Raise anything that does not look right
  • Check the areas you were most concerned about
  • Ask about maintenance for your system
08
Us to you · closing out

Final documentation

The project paperwork, photographs from the work, and any manufacturer documentation that comes with the products used. Keep it — it is what a future buyer, a future contractor or an insurer will want to see.

You receive

  • Final project documentation
  • Photographs from the work
  • Manufacturer documentation for the products used
  • Permitting records where applicable
Your Part

What to do before the crew arrives

None of this takes long, and all of it makes the first day go better. We will remind you of the relevant items when the start date is set.

  • Clear the driveway and the area around the house where you can, particularly on day one.
  • Move vehicles out from under the work area, and tell us if a vehicle cannot be moved.
  • Take down wall hangings and anything shelved that could shift — roofing work carries vibration through the structure.
  • Move patio furniture, plant pots and anything fragile away from the perimeter of the building.
  • Tell us about pets, and about anyone in the house who works nights or needs quiet hours.
  • Point out anything in the yard you particularly care about, including irrigation heads and low-voltage lighting.
  • Let neighbours know, especially in a townhome or on a narrow street where access matters.

What we handle

Protection of everything around the work area, material delivery and staging, debris containment and removal, permitting for the address, and coordinating any required inspection with the authority having jurisdiction.

If something on your property needs particular care — a mature planting, a pool cage, a generator, a satellite dish you actually use — tell us at the walkthrough rather than hoping we will notice.

Communication

What you should expect to hear, and when

The complaint we hear most often about other contractors is silence. These are the points where you should expect contact, and what to do if it does not happen.

Contact points across a typical project.
When What you should hear If you do not
After you send a request Confirmation we have it, and a conversation about arranging the inspection. Send it again or use the contact page. Requests do occasionally go astray.
After the inspection The findings and photographs, and a clear answer on what the roof needs. Ask. The findings are yours whether or not any work follows.
Before the start date Confirmation of the date, access arrangements and what to prepare. Call and confirm rather than assuming. Schedules move.
If the scope changes A call the same day, with a photograph of what was found and what it means. Stop the work and ask before any additional cost is incurred.
If weather moves the schedule To be told, rather than finding out when nobody arrives. Ask for a revised date in writing.
At completion A walkthrough with you, then the documentation. Do not treat the job as finished until the walkthrough has happened.
Protection & Cleanup

Roofing is a demolition job before it is a construction job

Tearing an old roof off produces a large quantity of heavy, sharp material that has to come down past everything you own. How that is managed is the single biggest difference between a contractor who is careful with a property and one who is not.

Before anything comes off

  • Landscaping and beds beneath the work area covered
  • Pool cages, screens and lanai structures protected
  • Air conditioning units and pool equipment covered
  • Driveways, walkways and walls below shielded
  • Debris route and material staging agreed with you

Before we leave

  • All roofing debris removed from the property, not left for later
  • Gutters and downspouts cleared of installation waste
  • Magnetic nail sweep across drives, paths, lawn and beds
  • Protection removed and planting checked
  • Exterior walked with you before the crew stands down

The nail sweep matters more than it sounds. Roofing fasteners in a lawn find bare feet, dog paws and car tyres for months afterwards if they are not collected.

Modified bitumen roofing being installed across a low-slope roof section
Low-slope installation in progress.
Process Questions

What people ask before committing to a project

Stage One

It starts with somebody looking at the roof

Stages one to three cost you nothing and commit you to nothing. At the end of them you will know what is on your roof, what condition it is in and what it needs — which is worth having even if the answer is that it needs nothing.

Call Free Inspection